Target of development
Target of development

Port Development

Dinh Vu Port Project: construction of four berths along quays with 785m in length, including two general and two container berths, which are expected to be completed in 2010. Ben Got - Lach Huyen Transshipment Area Project is to complete  02 mooring buoys No. 1&2 and freely anchorage point BG5.

1. Dinh Vu Port Project 


Geographical location: 20050'25,7"N - 106046'16,8"E
Depth alongside: -10.2m 
Max. size of vessel accessible: 20,000 DWT
Utilised area: 47.50 ha
Complete 4 berths of 785m in total including two general and two container ones
Dock No. 5 with total length of 217m is under construction 
The port is expected to be completed in 2010

2. Ben Got - Lach Huyen Transshipment Area Project

- Geographical location:
                        +   buoy No 1: 20049'39,187"N - 105053'59,450"E
                        +  buoy No 2: 20049'39,512"N - 105053'59,574"E
                        +  buoy No 3: 20049'09,132"N - 105054'06,559"E
                        +  buoy No 4: 20048'56,121"N - 105054'14,578"E
                        +  buoy No 5: 20048'34,762"N - 105054'29,331"E
- Depth alongside: -10,8m 
- Max. size of vessel accessible: 50,000 DWT
- Number of floating s: 05 
- 02 mooring buoys No. 1 & 2 have been completed and freely anchorage point BG5
- Remaining buoys are expected to be completed in 2010

Read More